[3D Barrier Implementation Case] Management of Separation Between Heavy Machinery and High Voltage Lines During Factory Construction
Management of the distance between heavy machinery and high-voltage lines during foundation work, steel frame construction, and the transportation of other materials associated with factory construction.
■Purpose and Evaluation of the 3D Barrier Introduction In the construction of a new factory, a 3D barrier was introduced to manage the distance from high-voltage lines for the use of heavy machinery such as crawler cranes and pile drivers that require work at heights. Previously, monitoring had to be done manually through visual checks or with a transit, but with the 3D barrier, the management area can be freely set, allowing for efficient and safe work. In particular, the system that immediately alerts with an alarm and patrol light when entering the danger zone (11m from the high-voltage line plus a 1m margin) has contributed to a sense of security.
- Company:計測ネットサービス
- Price:Other